Am I doing something wrong? I have reports that are scheduled to go out at specific intervals. That works. Then I update a report. Those scheduled reports seem to still pull the old report, not the updated one. How to I make them pull the current report, not the old one. Right now I have to delete the recurring report and set it up again. This doesn't seem right.
↧