Hi All,
Is this logical?
A bill of material (AAA) is created with a couple of components attached. Then production orders are raised against this Bill of Matierial (AAA). SAP B1 still allows user to delete the Bill of Material (AAA).
According to the usual standard in SAP B1, the master cannot be deleted when there is document attached to it.
How is this so?
My version is SAP B1 8.8 SP 0 PL21
Regards
Jessie