Hello Gurus:
Standard PDS CIF sends ECC Routing Scheduling Formula to APO PDS. However, we want to send ECC Routing Capacity Formula to APO PDS instead to match how we are doing capacity planning in ECC. Can anyone suggest a BADI / Method for the PDS CIF to make this happen? Would it be a BADI on the ECC side or APO side?
Thanks.
Andrea