Hi,
This is our current GR process
ASN -> inbound delivery -> TO creation (when goods physically arrive) -> TO confirmation -> customs declaration (outside SAP) -> GR
Goods are received in physical warehouse A with storage types Z01 to Z05.
Physical warehouse B is near to the KANBAN production line and has storage types Y01 to Y05. It is located 40km away from A
All Y and Z storage types are part of SAP warehouse REC.
We have following situation:
- every 2 hours a batch runs that replenishes the Y fixed bin storage types of warehouse B with the materials from the Z FIFO storage types of warehouse A.
- replenishment takes into account all WM stock in Z storage types
Requirement:
- replenishment should not take into account quantities that have been received in warehouse A without GR in MM/IM
- reason is that these quantities should not leave the premises of WH A as long as customs declaration is not ok
Possible solutions:
- GR before TO: not an option for business
- Move quantities on physical GR to another storage location than foreseen in the PO and move back when customs ok: business does not want to maintain additional storage location
- Other custo settings?
- User exit during replenishment (MWMRP002 - Replenishment control: TR quantity allocation)?
- Other?
Thank you for your valuable insights!
Geert