EC is not refreshing with the Data on the Project Task

$
0
0

Hi Experts,

 

I have a EC built and attached to the project task level with the help of task UUID available and with the released publicoutport of the task. I was able to successfully bind and get the details of the project task like project  task ID and UUID.

 

Here the problem I have is like there a some header fields and table is available on the EC. In the Header along with the Task ID and Project ID i have a field which will accommodate the description and this is specific and unique to each task on the project and at the same time the table values also will be keep on changing according to the task it is assigned and as user wish to be

 

problem here is if user gives a set of values on the EC for one task those are not getting refreshed (Empty fields are not appeared) when user navigates to the other task of the project (both the project tasks are different and they absolutely captured when project task id changes through the bonded inports and outports), only the field values are remaining same and if user tired to delete or modify any field value on the second task the first task data is also getting overwritten.

 

I have no clue how to over come this problem of overwriting or same data getting replicated in every task.

 

Please help me out in coming out of this problem and to have data specific to task and not overwriting the old one

 

Regards

Hanu K