HI....
i have a cost center 212010 my cost element 440000 in kp06 i have planed fixed cost is 1000 save the kp06
in same kp26 same costcenter 212010 my activity is MAIN I have maintain the plan activity 100 capacity 100 and variable cost is 100 maintain the kp26
i have the run the kspi i just want to plan activity rate per hour
But system will show the above activity analysis how system will calculate the 3336,13
I want know activity rate per hour in capacity i have maintain the 100 hours
Thanks and regards
P.Ramkey