There is a variant config. material with two different requirement types, lets say A & B.
On running the MRP for this material, a dependent requirement is getting generated. This dependent requirement is being generated for requirement type A even though usage probability of its characteristic values is not maintained in requirement type A that this requirement should have been generated. But usage probability for the same characteristic values has been maintained in requirement type B. The dependent requirement percentage usage probability is matching with that of B's usage probability. But in MD63, usage probability for A shows that its blank while for that of B, the value for usage probability maintained is displayed, which is correct.
Somehow dependent requirement for component of A is getting generated on on the basis of usage probability of B on MRP run.
Has anybody faced a similar issue earlier? Any clue about how to resolve this interlink between the usage probabilities of two requirement types so that usage probability of one requirement type is not copied from another requirement type?
Best Regards,
Nitish Sinha