Dears
I got the error message during the Production Planning Run
Heuristic settings variant from batch processing UI could not be applied Message no. /SAPAPO/PAGT_HEUR021
Application error while scheduling occured (e.g. plg. intervals violated) Message no. /SAPAPO/PAGT_HEUR009
Also i tried to run it using transaction /SAPAPO/CDPS0
for the Detailed Scheduling Planning Board
. the error message :
Heuristic 'Multi-Resource Scheduling' executed without result
Please Advise
Regards
Rami