Similar to these 2 posts for WORKDAYS_BETWEEN():-
http://scn.sap.com/thread/3921319
http://scn.sap.com/thread/3919077
I find that the ADD_WORKDAYS() function is not working in the Calculated Column window when building a graphical CV.
I'm using Studio client 2.2.13 with SPS11 112.02.
Should this be an OSS Note? I don't see anything currently open.