Hello
I have configured a Zero Coupon bond, using the Amortization procedure as below. (Amortization procedure 1000)
Image may be NSFW.
Clik here to view.
Above Amortization procedure is assigned to my PMP SAME
Image may be NSFW.
Clik here to view.
In the above PMP, I activated only the Amortization step.
Now my class id is created as below
Image may be NSFW.
Clik here to view.
In the above, I ticked the end of term checkbox
My simulation details are as below
Image may be NSFW.
Clik here to view.
In the above also, I checked the start date 01.09.2016.
After the above transaction posting to FI, when I did the monthly amortization (TPM1), System allows me to do valuation on each month end date until Oct 2016. However on last month (Nov 2016), I am able to run the valuation on Nov 29th (instead of 30th), and as a result, my amortization is done for 1 day less
Image may be NSFW.
Clik here to view.
I would be so grateful if someone can confirm me that if the Bond duration is say Sep 01, 2016 till Nov 30, 2016, then how shall I maintain the class id, and how should I simulate the transaction so that my amortized amount is FULLY recovered (in the above case, INR 22000)
Appreciate your help
Rgds
Sameer