Hi, my company deals with some components that is managed and ordered outside the SAP R2 system but we still set these components in the BOM but with the production relevancy unchecked in the CS02. How do I set these component to ensure that these components are printed out in the component list of the production shop paper even with the production relevancy remains unchecked?
↧