Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 3523

How to Perform Init delta in BW Production system

$
0
0

Dear Friends,

 

 

We have a go live this saturday for MM-Purchasing module. We did not get any down time. i am not clear about the sequence of steps to be performed in ECC and BW. In quality system i performed filling up set table and loading data to BW which is taking approximately 7 hours.

 

 

My data flow is direct load to Info cube using 2lis_02_ITM and SCL datasources.

 

My plan is to perform below steps. correct me if iam wrong. We do not have down time.


 

Step 1: Move ECC TR to ECC- PRD system

Step 2: Replicate datasources in BW -PRD

Step 3: Move BW TRs to BW PRD system

Step 4: Delete set up table

Step 5 : Fill set up table  ( 

Step 6: Run infopackage Init delta with data transfer.

Step 7: Delta load via process chain on daily basis.

 

Q1. After deleting set up table do i have to fill set up table or should i run infopackage init without data transfer and fill set up table.? here also am confused about which Init delta i need to use to load full load.

 

Q2.  do i need to load master data first? if yes. Should i follow the same steps for master data load?

 

Q3.  how do u know that i have pulled correct data without missing any records posted during this activity.

 

Q4. should i use only delta infopackage in my process chain?

 

Please guide me with your valuable input.

 

 

Thanks

Vijay


Viewing all articles
Browse latest Browse all 3523

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>