Hello,
I have a 'Severe error' when using the Software Update Manager in the Extraction section under phase PREP_INPUT/TOOLCHECKXML_INI.
Last error code set: Error: The command 'brconnect' from tool 'brconnect' could not be executed successfully.
This is a SAP NetWeaver upgrade from 7.02 to 7.4; using SUM 1.0 SP13 PL8.
I have a distributed heterogeneous environment. The Central Instance is RedHat Enterprise Linux 6.2. The Database is Oracle 11.2.0.3 on AIX 7.1.
SUM is being executed from the Central Instance host.
I look forward to hearing your thoughts on how to resolve this issue.
Regards,
John McCann
SAP Basis Administrator